Gray Hall Dorm- GFAFB

Reconfigure rooms and install new interior finishes. Replace casement windows with new windows meeting AT/FP Requirements. Replace metal gutters and downspouts. Replace cabinets, countertops, shelves and mailboxes. Upgrade bathrooms by replacing showers, toilets, flooring, exhaust fans, and repainting walls and ceilings, and replace floor sinks where required as shown on the Drawings. Replace interior lights, emergency exit lighting, ceiling fans, and exterior light fixtures. Replace existing fire detection system. Install Mass Notification System. Replace HVAC system. Mitigate asbestos-containing materials, lead-based paint materials and mold.